
- 49.0 x 84.0 cm
藏品详情
A detailed 1959 architectural drawing by Franz Ehrlich showcasing an intricate construction schedule for a TV studio project, blending Bauhaus precision with graphic design excellence for your collection.
手工油画复制品
由我们的艺术家按需定制,为您提供您所选尺寸及画框的布面手工油画。 ( 切换至版画销售渠道
切换至数字图像销售渠道)
更多关于此画作的信息
只需简单四步,即可订购您的画作
请慢慢挑选。您可以随时更改任何选项;订单详情卡中的价格将随您的选择实时更新。
1 四步中的第一步
您想要哪种尺寸?
这些尺寸均保持了原画的比例。示意图展示了您所选尺寸在墙面上的效果,其位置位于一张两米宽的沙发上方。
或输入您自定义的尺寸
您可以从与原作比例一致的预设尺寸中进行选择。
请输入您需要的宽度和高度,以适配您的画框或墙面。由于作品为手工绘制,若选择不同比例的尺寸,艺术家可能会在画面边缘多画一些或稍作裁剪 —— 由您决定。在开始绘画之前,我们会为您发送一份数字效果图供您确认。本页面上展示的图片并非最终实物 —— 只有效果图才能反映真实结果。
2 四步中的第二步
您希望如何装裱:卷轴装、绷框装还是带框装?
以下价格对应您在第一步中所选的尺寸。
选择绷边画布的边缘样式
选择您的画框
白色边缘 ¥1
边缘晕染效果 ¥1
延展式 ¥1
P118B ¥10
P118H ¥10
P118W ¥10
P438Z ¥10
P508JH ¥12
P508YH ¥12
P805H ¥10
P805Z ¥10
P919BZ ¥10
P919G ¥10
P919XJ ¥10
P959ZH ¥10
P968JZ ¥12
W106C ¥8
W218G ¥10
W218JH ¥8
W218Y ¥10
W307PJ ¥10
W316G ¥10
W316PJ ¥8
W316Y ¥10
W398PJ ¥8
W4111J ¥10
W500HY ¥15
W500JH ¥15
W692G ¥12
W849H ¥8
W940BG ¥15
W953PJ ¥8
H24-GOLD ¥30
H24-SILVER ¥30
H36-GOLD ¥45
H36-SILVER ¥45
带框
边框材质: . 含框总尺寸: .
3 四步中的第三步
您想对画作进行任何修改吗?
大多数人的回答是否定的。由于每一幅画作都是手工绘制,我们的艺术家也可以为您进行定制。
下单后,ArtsDot.com 团队将通过电子邮件联系客户获取具体指令,并提供效果预览图
4 第四步(共四步)
几种饰面选项
所有选项均为可选。已选择的答案不会产生额外费用。
出自哪位艺术家之手?
像博物馆里的那样,配上一块铭牌?
青铜铭牌雕刻详情
This elegant plaque features the artist's name and the title of the artwork, finely engraved for a timeless presentation.
It is made from bronze with a refined, elegant finish. The text is precisely laser-engraved for a sharp and permanent result. Measuring 9x2 cm, the plaque is compact yet easy to read. It's built to be durable and scratch-resistant, offering a professional, museum-quality look. Mounting is simple thanks to the included adhesive backing.
透明亚克力铭牌详情
The plaque includes essential engraved details such as the artist's name, the title of the artwork, the date it was created, the type of media used-like oil on canvas or watercolor-a brief description of the piece, and a QR code that links to the complete artwork information.
It is crafted from clear acrylic, offering a sleek, modern appearance. The text is UV-engraved in black to ensure strong visual contrast. With a size of 10x15 cm, it ensures optimal readability. It comes equipped with two metal hooks for secure wall mounting. The plaque is designed to be weather-resistant, making it suitable for various environments, and it includes interactive features that work seamlessly with smartphone scanning.
黑色亚克力铭牌详情
This elegant plaque includes engraved information such as the artist's name, the title of the artwork, the date it was created, the type of media used (like oil on canvas or watercolor), a short description of the artwork, and a QR code for quick access to more information.
The plaque itself is made from refined black acrylic with a premium finish. The text is laser-engraved in white for high contrast and readability. Its size is 10x15 cm, designed to be easy to read. It comes with two metal hooks for professional mounting. The design is sleek and fits any interior style. It is also weather-resistant and durable, with built-in digital integration for mobile compatibility.
需要保护性光油吗?
您预计何时收到?
✓ 确认并下单
您的画作,正如您所订购的那样
CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM
复制品材质
复刻品尺寸
-
精选资深艺术家
更丰富的细节、更精湛的工艺以及更充裕的制作时间
-
复制画装裱选项
-
-
对于任何边长超过 105 厘米(约 41 英寸)的艺术品或复制品,画框将以拆解后的组件形式发货。此方法可确保安全送达并防止运输过程中的损坏。
需由专业人员组装 —— 本产品不适用于 DIY 操作。
该组件必须由经验丰富的专业装裱师进行组装及画布绷装,过程中需使用木工胶(不随附)、画布绷边钳以及夹具,以确保在胶水干燥期间保持内框方正。组装不当或画布张力不均可能会对艺术品造成永久性损坏,且此类情况不在我们的保修范围之内。
包含所有实木条,尺寸精确,便于组装。
使用随附的螺丝进行组装,另需准备用于角部连接的木工胶(本品不含木工胶),请由您的装裱师自行准备。
需另备专业工具(本套件不含):画布绷紧钳以及用于在胶水干燥过程中保持木条方正的夹具。
重要提示:
角部连接处需要使用木工胶,边框条必须使用夹具固定直至胶水完全干透,且在组装好的框架上绷紧画布需要用到画布拉伸钳。以上工具均不包含在套装内。请在订购此尺寸前,预先联系经验丰富的专业装裱师。
展品铭牌
-
-
保护性清漆
光泽清漆(提亮色彩,防光防潮)
-
定制我的艺术品
定制化示例:替换面部为客户照片;添加宠物(例如,将猫替换为狗);在背景中加入隐藏信息;更改背景风景或元素。
-
加急
全球配送()仅需 3-4 周即可送达,无需等待标准时效的 5 周。(3 November)。品质始终如一,绝不妥协。
-
极速达
全球配送(),预计 5 周送达。(10 November)。
已包含
最终结算价
¥ 1766
每份订单均包含
- 全球免运费特快专递服务
- 优质亚麻画布
- 全程运输保险
- 关税退款保证
- 色彩精准还原保证
- 100天退货保障(仅限制造缺陷)
- 100% 退款保证
- 多件购买优惠
The Precision of Progress: A Blueprint of Visionary Intent
In the intersection of architectural rigor and graphic artistry lies a remarkable piece of mid-century documentation: CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. Created in 1959 by the master of form, Franz Ehrlich, this work transcends its utilitarian origins to become a captivating study of order and anticipation. At first glance, the viewer is met with an intricate tapestry of tables, diagrams, and charts that map out the birth of a media space. It is not merely a schedule; it is a visual manifesto of structural possibility, where every line and cell serves as a heartbeat in the rhythm of industrial progress.
The painting, executed on paper with a delicate yet commanding presence, measures 49 x 84 cm, offering a panoramic view into the meticulous mind of its creator. Ehrlich utilizes a technique that blends the precision of technical drafting with the expressive soul of graphic design. The composition is dense with information, yet it maintains a rhythmic balance that guides the eye through a labyrinth of data. For the collector or interior designer, this piece offers a sophisticated geometric complexity that serves as a stunning focal point in modern, minimalist, or industrial-themed spaces, providing a sense of intellectual depth and structured elegance.
A Legacy Forged in Bauhaus Discipline
To understand the soul of this work, one must look to the hands that held the pen. Franz Ehrlich was a product of the legendary Bauhaus Dessau, an institution that redefined the relationship between art, craft, and industry. Having studied there between 1927 and 1930, Ehrlich carried the avant-garde principles of functionalism and clarity into his later works. This specific piece, created decades after his formative years, reflects a matured mastery of the Bauhaus ethos—the idea that beauty is found in the most efficient and logical arrangement of elements.
The historical context of 1959 adds a layer of profound gravity to the work. Living through the turbulent shifts of mid-century Germany, Ehrlich’s work often mirrored the tension between individual creativity and the collective necessity of reconstruction and planning. The subject matter—the implementation of TV studios—speaks to an era of burgeoning communication and the technological optimism of the post-war period. There is a quiet heroism in these charts; they represent the blueprint for a new way of seeing the world through the lens of emerging mass media.
The Aesthetic of Order and Emotional Resonance
Beyond its technical merits, the artwork possesses an evocative emotional impact that resonates with anyone moved by the beauty of logic. There is a certain serenity found in its absolute organization. The repetition of tables and the structured flow of diagrams create a meditative quality, inviting the viewer to lose themselves in the details of the project's timeline. It evokes a sense of nostalgia for an era when progress was measured in tangible, meticulously planned steps.
For those seeking to adorn a curated collection or a professional studio, this reproduction offers more than just decoration; it offers a conversation piece that bridges the gap between historical documentation and fine art. The interplay of light and shadow within the intricate linework provides a tactile richness that makes every viewing a new discovery. It is a celebration of the architect's vision—a moment frozen in time where the future was being carefully, beautifully constructed.
常见问题与解答
创作《CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM》时,弗兰茨·埃利希 的年龄是多少?
弗兰茨·埃利希 在 52 岁时创作了《CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM》。艺术家出生于 1907,该作品创作于 1959 年。
在“CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM”中,对比与和谐是如何交织融合的?
弗兰茨·埃利希 的《CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM》 的色彩构成将 Serene 的对比与 Unified Palette 的和谐融为一体。
"CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" 创作于哪一年?
弗兰茨·埃利希 的《CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM》创作于1959年。
相似作品
弗兰茨·埃利希
1907 - 1984, 德国
艺术家简介
早年生活与教育历程
弗兰茨·埃利希 (Franz Ehrlich) 是一位享誉盛名的德国建筑师、书法家及平面设计师,于1907年诞生。在他成长的岁月里,一种对艺术天生的敏锐直觉便已悄然萌芽,这促使他在1927年至1930年间进入德绍包豪斯学院深造。这所享誉世界的顶尖学府在塑造埃利希的艺术视野方面发挥了至关重要的作用,让他得以深度接触并融入当时最前卫的艺术运动之中。艺术生涯与共产主义背景
埃利希与共产党的紧密联系对其个人生活及职业生涯产生了深远的影响。1935年,他不幸遭到纳粹政权的逮捕与监禁,这一沉重的历史事件极大地改变了他艺术探索的轨迹。然而,即便身处如此严峻的挑战之中,埃利修建仍不懈地为艺术界做出贡献,留下了一份既令人振奋又引人深思的宝贵遗产。代表作品
埃利希最为人称道的杰作包括:- 《800年:Das Buch [书]》。平面图与视图(莱比锡贸易博览会展品展示架),这件作品见证了他在设计与建筑领域极具创新性的探索精神。
- 鲍曼教授住宅施工图(基础平面图),充分展现了他在建筑规划方面的深厚造诣。
- 1933年(摄影雕塑广告项目),这是一场摄影与雕塑的独特融合,彰显了他实验性的艺术本质。
收藏埃利希作品的博物馆与机构
ArtsDot.com 拥有丰富的埃利希作品馆藏,其中包括上述提及的多件重要杰作。此外,位于德国德绍-罗斯劳的包豪斯德绍基金会 (Bauhaus Dessau Foundation) 也是其艺术成就的重要存放地。传承与影响
弗兰茨·埃利希对艺术界的贡献是多维度的,反映了他广泛的兴趣与卓越的才华。无论是在创作层面还是个人经历层面,他的生命轨迹都为我们观察德国历史上关键时刻中艺术与政治的交织提供了极其珍贵的视角。- 在 https://ArtsDot.com/@/franz-ehrlich 浏览更多埃利希的作品
- 前往 包豪斯德绍基金会 (德国,德绍-罗斯劳) 探索其馆藏珍品




对于任何边长超过 105 厘米(约 41 英寸)的艺术品或复制品,画框将以拆解后的组件形式发货。此方法可确保安全送达并防止运输过程中的损坏。



